Balaceanca - Proiect EDGE ROUND DESIGN

Balaceanca

Completed2023
Category
Technological Installations
Client
SNTGN Transgaz SA
Duration
8 months

General Overview

Development and implementation of infrastructure for the Balaceanca natural gas compression station. Complex welding and assembly works for pressure equipment.

Implemented Services

Specialized Welding
Pressure Equipment Assembly
Non-Destructive Testing
ISCIR Certification

Technical Specifications

Authorizations and Certifications

  • • ISCIR certifications for pressure equipment
  • • EN 1594 standard for natural gas pipelines
  • • ASME B31.8 compliance for gas transport systems
  • • ISO 3834-2 for welding

Technologies Used

  • • TIG welding for carbon and stainless steels
  • • Radiographic control for critical welds
  • • Real-time pressure monitoring systems
  • • Turbo-compressor compression equipment

Project Information

ClientSNTGN Transgaz SA
LocationBalaceanca
Year of completion2023
Duration8 months
StatusCompleted
Scope of application

Natural gas compression station

Interested in a similar project?

Contact us for a free consultation and a personalized offer.

Request Quote

Project Gallery

Discover images and videos from the realization of the Balaceanca project, demonstrating the quality and professionalism of the EDGE ROUND DESIGN team.

12images

Proiecte Similare

Descoperă alte realizări EDGE ROUND DESIGN în domeniul infrastructurii energetice