
The project carried out for DepoGaz SA aims to build the natural gas drying station with triethylene glycol in Group 145 Bilciurești. It includes the realization of the wet gas collector and the underground power supply line (L.E.S.) for the same group, contributing to the optimization of natural gas transport and processing infrastructure.


The project carried out for DepoGaz SA aims to build the natural gas drying station with triethylene glycol in Group 145 Bilciurești. It includes the realization of the wet gas collector and the underground power supply line (L.E.S.) for the same group, contributing to the optimization of natural gas transport and processing infrastructure.
The project carried out for DepoGaz SA aims to build the natural gas drying station with triethylene glycol in Group 145 Bilciurești. It includes the realization of the wet gas collector and the underground power supply line (L.E.S.) for the same group, contributing to the optimization of natural gas transport and processing infrastructure.
Edge Round Design S.R.L. contributed to modernizing natural gas processing infrastructure by executing the project for DepoGaz SA in Bilciurești, Group 145. Main activities included constructing the wet gas collector necessary for the entire system's operation. The project demonstrates the company's expertise in working with complex energy industry installations, from processing to transport and distribution, ensuring compliance with specific technical and safety standards.
Wet gas collector and group interconnection
Contact us for a free consultation and a personalized offer.
Request QuoteDiscover images and videos from the realization of the Bilciuresti Depogaz project, demonstrating the quality and professionalism of the EDGE ROUND DESIGN team.





Descoperă alte realizări EDGE ROUND DESIGN în domeniul infrastructurii energetice