Ghiosesti - Proiect EDGE ROUND DESIGN

Ghiosesti

Completed2025
Category
Modern Infrastructure
Client
SNTGN Transgaz SA
Duration
4 months

Edge Round Design S.R.L. executed safety works on the DN 700 pipeline, on the Platoul Izvor-Sinaia to Filipesti section, in the Ghiosești area, Prahova county. The project aimed to consolidate and secure the natural gas transport pipeline to ensure transport integrity and continuity.

General Overview

The safety project for the DN 700 nominal diameter natural gas transport pipeline, connecting Platoul Izvor-Sinaia and Filipesti, successfully executed by Edge Round Design S.R.L. in the Ghiosești area, Prahova county. Works were directed towards consolidating existing infrastructure, remedying potential risks, and ensuring pipeline compliance with operational safety standards. The intervention involved technical analysis, pipeline condition evaluation, and implementation of appropriate solutions to guarantee safe operation and prevent potential incidents, thus contributing to the security of the national natural gas transport system.

Implemented Services

Advanced Technologies
Precision Welding
Automated Systems
Technical Inspection

Technical Specifications

Authorizations and Certifications

  • • ISO 9001:2015 - Quality Management
  • • Welder certifications according to applicable standards (e.g., ISO 9606)
  • • Inspection and testing procedures according to industrial standards
  • • Transgaz S.A. specific requirements
  • • ANRE authorizations

Technologies Used

  • • Pipeline condition inspection and evaluation (NDT: UT, MT, PT, visual, etc.)
  • • Pipeline defect remediation (e.g., repair welding, segment replacement, repair sleeves)
  • • High-quality welding execution according to WPS specifications
  • • Pipeline integrity testing after intervention (hydraulic/pneumatic test)
  • • Anti-corrosion protection and insulation
  • • Earthworks and land remediation
  • • Supervision and monitoring during works
  • • Manual and automated welding (SMAW, GMAW, GTAW, FCAW, SAW)

Project Information

ClientSNTGN Transgaz SA
LocationGhiosesti
Year of completion2025
Duration4 months
StatusCompleted
Scope of application

Complete gas distribution infrastructure

Interested in a similar project?

Contact us for a free consultation and a personalized offer.

Request Quote

Project Gallery

Discover images and videos from the realization of the Ghiosesti project, demonstrating the quality and professionalism of the EDGE ROUND DESIGN team.

9images
1video