Onești Compression Station - Proiect EDGE ROUND DESIGN

Onești Compression Station

Completed2021
Category
Technological Installations
Client
SNTGN Transgaz SA
Duration
5 months

Edge Round Design S.R.L. executed mechanical works, metal structures, non-destructive testing, and technological installations for modernizing the Onești natural gas compression station. The project aimed to consolidate the gas transport system on the Onești-Isaccea corridor, including flow reversal (Phase 2), contributing to national energy infrastructure.

General Overview

Project for consolidation and modernization of Romania's natural gas transport system, executed on the Onești-Isaccea section and flow reversal (Phase 2), with the main purpose of modernizing the Onești natural gas compression station. Edge Round Design S.R.L. executed a complex range of works, including: mechanical works on pipeline systems, realization of metal support structures, application of non-destructive testing to ensure joint quality, as well as installation of technological components specific to gas compression stations.

Implemented Services

Pipeline Systems
Metal Structures
Thermal Insulation
Non-Destructive Testing (MT, PT, US)
Underground Civil Works

Technical Specifications

Authorizations and Certifications

  • • ISO 9001:2015 - Quality Management
  • • ISO 3834-2:2021 - Quality requirements for fusion welding
  • • EN 1090-1:2012+A1:2012 - Execution of steel structures
  • • Natural gas industry specific standards
  • • Standards for technological installations
  • • ISCIR Authorizations
  • • ANRE Authorizations
  • • Transgaz S.A. specific requirements

Technologies Used

  • • Pipeline assembly and pre-assembly
  • • Non-destructive testing
  • • Process equipment installation
  • • Control and automation systems
  • • Anti-corrosion protection and insulation
  • • Manual and automated welding

Project Information

ClientSNTGN Transgaz SA
LocationOnesti Statie Comprimare
Year of completion2021
Duration5 months
StatusCompleted
Scope of application

Complete compression station modernization and national system interconnection

Interested in a similar project?

Contact us for a free consultation and a personalized offer.

Request Quote

Project Gallery

Discover images and videos from the realization of the Onești Compression Station project, demonstrating the quality and professionalism of the EDGE ROUND DESIGN team.