Edge Round Design S.R.L. executed complex works for replacing and modernizing key components at a high-capacity industrial incinerator, within the project carried out for Visser & Smit Hanab B.V. These included replacing superheaters II and IV, as well as furnace membrane walls, contributing to plant performance and safety optimization.

General Overview

The project carried out for Visser & Smit Hanab B.V. aimed at a major repair and modernization intervention at a large-capacity industrial incinerator. Edge Round Design S.R.L. successfully managed the replacement of critical components, namely superheaters II and IV, essential parts in the energy recovery process. Work was also carried out to replace the furnace membrane walls, areas subjected to extreme temperatures and operating conditions. These interventions required exceptional technical expertise, specific materials and high-precision welding and assembly techniques, contributing to the improvement of efficiency, reliability and operational safety of the industrial incinerator.

Implemented Services

Major Equipment Installation
Specialized Welding
Non-Destructive Testing
European Standard
TAR (Turn Around)

Technical Specifications

Authorizations and Certifications

  • • ISO 9001:2015 - Quality Management
  • • Specific standards for high-temperature industrial equipment (e.g., ASME Section I, ASME B31.1)
  • • ISO 3834-2:2021 - Quality requirements for fusion welding
  • • EN 1090-1/2 - Execution of steel structures
  • • Specific certifications for welders

Technologies Used

  • • Dismantling and replacement of large components
  • • High-performance welding with high-temperature resistant materials
  • • Non-destructive testing (UT, MT, PT, VT)
  • • Precision assembly of new components
  • • Thermal insulation technologies
  • • Heavy lifting equipment usage
  • • Surface preparation
  • • Manual and automated welding

Project Information

ClientVSH HVC Dordrecht
LocationVSH HVC Dordrecht
Year of completion2018
Duration4 months
StatusCompleted
Scope of application

Super-heater replacement and major equipment installation

Interested in a similar project?

Contact us for a free consultation and a personalized offer.

Request Quote

Project Gallery

Discover images and videos from the realization of the VSH HVC Dordrecht project, demonstrating the quality and professionalism of the EDGE ROUND DESIGN team.

46images

Proiecte Similare

Descoperă alte realizări EDGE ROUND DESIGN în domeniul infrastructurii energetice